Design Pump Station2 Upgrade, CCAFS, FL

The scope of the project is to demolish the existing booster pump system. piping, electricalsystem, chemical feed system, and control system; modification to the existing building to accommodate the new booster pump system and piping; installation of new booster pumps, piping, associated valves, chemical feed system, control systems, generator and fuel tank and electrical system an construction of a building to house the new chemical feed system.   This project was warded on Sept 2011.

Design Build Flamingo Maintenance Office Building


Construction of a 850 sf pre-manufactured concrete building, associated foundation and retaining wall, and site work.  The site work included backfilling 4' for pads for theMaintenance and Hazmat building and the future Emergency Vehicle Storage building, a retaining wall on the south side and between maintenance building and the existing building, raising the manhole to adjust for the new elevation, and handicap ramps.  The pre-manufactured building was engineered and delivered onsite in two sections.  The sections were lowered and set onsite using a crane and the seams welded and sealed. 

 

The scope of the project is to replace approximately 4,000 linear feet of the existing
24-inch main underground potable water line with 16-inch PVC pipe.  This project is
being accomplished with in-house trades and completed on May 2011.

The scope of the project is to install approximately 3,341 linear feet of 12-inch,
10-inch, 8-inch, 6-inch, 4-inch, and 2-inch potable and fire water line including
fire hydrants and back-flow preventers.  This project is being accomplished with
in-house trades and scheduled to be completed on April 2012.
 

 


Repair Force Main Facility 1719 & 44407, 
Cape Canaveral Air Force Station, FL

The scope of the project is to install approximately 4,200 linear feet of force main sewer line from the Lift Station 1719 to the sewer treatment plant and from Lift Station 44407 to a new manhole. This project was self-perform with in-house trades and completed on February 2010.  

 

Demolish Communication Antenna Towers, Cape Canaveral Air Force Station, and Maklabar Annex, FL


The scope of the project is to demolish and dispose eight sets of communications antenna towers at Cape Canaveral Air Force Station and 12 sets of communication antenna towers at Malabar Annex. This project was self-perform with in-house trades and completed on February 2010.  



Repair Potable & Fire Water at Blast Media Area, Cape Canaveral Air Force Station, FL


The scope of the project is to install approximately 2,710 linear feet of water line needed forconverting the existing potable water distribution system over to a dedicated fire water system. This project was self-perform with in-house trades and completed on February 2010.  

Remove 26 Abandoned Fire Hydrants, Cape Canaveral Air Force Station, FL

The scope of the project is to remove and dispose 26 abandoned fire hydrants at various locations. This project was self-perform with in-house trades and completed on April 2010.  

Design/Build Waste Water Meter for Orlando VAMC, FL

The scope of the project is to design and install a wastewater meter system on the existing sewer line to comply with the City of Orlando wastewater permit. This project was awarded on September 2010 and completed on March 2011.  

 



 

Repair Water System, Mission Areas, Cape Canaveral Air Force Station, FL

The scope of the project is to install and demolish underground water distribution piping, service piping, fire hydrants, and backflow preventers at three locations in the Mission Control Areas. This project is being accomplished with in-house trades and completed on November 2011.  

Demolish Building 865, Minneapolis ARS, MN.

The scope of the project is to demolish the Multi-Purpose Building 865; underground utilities; provide new underground secondary electrical distribution to Building 861 and 862; perform asbestos and lead abatement; and site restoration. The project was awarded on Sep 2011 and scheduled to be completed on June 2012. 

Demolish Building 865, Minneapolis ARS, MN.

Repair Water System Lines, East Industrial Area, Cape Canaveral Air Force Station, FL. 

The scope of the project is to install approximately 8,900 linear feet of 12-inch, 8-inch, 6-inch, 4-inch, and 2-inch potable and fire water line including fire hydrants and backflow preventers. This project is being accomplished with in-house trades and completed on October 2011.  

Demolition Multiple Award Contract (DMAC), Task Order No. 001, Demolish Bldg 1710, Fairchild Air Force Base, WA. 

DMAC contract is a multiple award commercial demolition services acquisition based on a general Performance Work Statement (PWS) with one basic year plus four option years. The work consists of demolition, abatement, and site restoration services at Fairchild AFB, Washington. The scope of Task Order No. 001 is to demolish Building 1710 and perform site restorations. The task order was awarded on Sep 11 completed on Nov 11. 




Design and construction of modifications to the Flamingo membrane biological reactor wastewater treatment plant soit can treat current  low sewage flow rates and low influent Biochemical Oxygen Demand (BOD) (reducing maximum plant capacity from 90,000 to 70,000 gpd).